Project Story
18 December 2014

Matimba Power Station

Babcock carried out the redesign of a full main steam system at Matimba Power Station, replacing X20 with P91, where the team re-engineered the plant using 3D scanning technology that allowed for the complete detailed fabrication drawings, calculations and stress analysis to be generated in under three months. This is the first full system replacement for Eskom on a main steam system.

Matimba Power Station

 

During the design, the integration of engineering, fabrication, transport and erection enabled Babcock to configure the system using concurrent engineering principles. The result was an economical and technically compliant offering, with short lead times and minimised plant downtime.

 

The actual replacement time for the mainsteam system, including support systems was 90 days during a normal General Overhaul Cycle.

 

Interesting fact:

To fully capture the main steam system and surrounding plant, Babcock performed more than 200 individual scans, generating a total of 10 360 files.

Want to know more?

Send us a message and we will be happy to help you.

Contact Us

Internet Explorer is no longer supported.
Please download one of these free and up-to-date browsers:



Firefox
Chrome
Microsoft Edge